Thursday, July 5, 2007

Ground floor beams

Even though all works seems slowly went on, my contractor could surprised me with the ground floor beam’s steel works. Half of steel reinforce beam were bind and set on the right level. I had to concentrate the accuracy of level because it’s easy to adjust the level in this stage.
Almost of steel works are right but riverside terrace. I adjusted beam level higher 30 cm than the design because I changed the design of the terrace flooring.