Friday, July 27, 2007

All first floor columns finished


On 25th July, the works went faster than I expected. All column were fill concrete already and some of riverside columns were released their formworks. The height of columns were stoped at the bottom level of 2nd floor beams at 2.40 meters.
I could imagin the end result at this time.

No comments: